Home > Latest Updates > Latest Engineer... > Saturday 19 July 2008

Top 5 viewed Stations:

Now with new improved station information and live departure boards.

1. London Fenchurch Street

2. Southend Central

3. Chafford Hundred Lakeside

4. Upminster

5. Southend East

Saturday 19 July 2008

Dates (s) affected Saturday 19 July 2008
Locations (s) affected Fenchurch Street to Barking and Grays to Pitsea
Detail

Due to engineering works in the Fenchurch Street area, all trains will divert to Liverpool Street. Trains will no longer serve West Ham, Limehouse or Fenchurch St. Trains diverted to Liverpool Street will additionally call at Stratford.

Trains from London will run to:

- Shoeburyness via Laindon
- Southend Central via Rainham and Tilbury

A shuttle service will be in operation between Upminster and Grays.

From 2010, trains from London to Southend Central via Rainham and Tilbury will terminate at Grays. Rail Replacement buses will be provided for onward travel. The last departure from Liverpool Street that will run through via Rainham and Tilbury will be the 1858 departure. The last departure from Southend Central that will run through via Tilbury and Rainham will be the 1926 departure.

Revised timetables

Amended Timetable

FAQs  |  About Us  |  Privacy Policy  |  National Express